Guangdong Irrigation District Agricultural Water Pricing Reform Metering Equipment Procurement Project

Project Background

The irrigation district in Guangdong faces challenges due to its vast coverage, scattered infrastructure, complex terrain, and uneven spatiotemporal distribution of rainfall. Existing conditions—including diverse climates, soil types, crop growth patterns, and dynamic water resource availability—hinder optimal water allocation and the goals of agricultural water pricing reform.


System Objectives

The Metering Information Management System aims to:


Solution Implementation

Huaju Scientific Instruments’ integrated radar monitoring equipment provides a one-stop solution:

  1. Telemetry Station Deployment:
    Install integrated radar flow meters and open-channel flow meters (Parshall flumes) to enable automatic collection, transmission, and visualization of water level, flow rate, and image data.

  2. Automated Water Measurement:
    Deploy low-power level gauges for automated water level monitoring and reporting.

  3. System Integration:
    Integrate newly established telemetry stations into the existing metering information system.
    Centralize data management, queries, and display through a unified platform and mobile applications.



Key Outcomes


Site of Application



Related Products